Consultation and planning
Our team combines technical consultation, project planning and configuration design for the intended site and operating model.
Language available
You can switch language while staying on the corresponding page.
Suggestion based on approximate location.Engineering, production, delivery & after-sales
See how YOLO connects project planning, factory production and quality checks, shipment preparation, installation support and after-sales responsibilities.
Get a Project RecommendationManufacturing and delivery facts
These points summarize our manufacturing and project-delivery framework. Final model, schedule, training, warranty and service terms are confirmed in the quotation and contract.
Our team combines technical consultation, project planning and configuration design for the intended site and operating model.
The factory describes in-house manufacturing from design to assembly using standardized production processes.
The factory FAQ states that its quality-control team performs sample and component inspections during production.
The same FAQ states that each shipment receives a 100% final inspection before release.
Our general machine-production reference is 15–30 days. The confirmed schedule remains model- and order-specific.
On-site training is listed as support for agents; availability and scope for each market or project must be agreed before ordering.
Project document pack
The exact document set depends on model and contract. Confirm the required language, format and approval stage before production.
Quotation or contract, configuration list, inclusions, exclusions, delivery basis, payment milestones and project contacts.
Model data, utility requirements, layout basis, foundation or interface information and customer site-preparation responsibilities.
Agreed inspection evidence, packing information, loading details and the commercial or transport documents required for the shipment.
Installation guidance, commissioning checklist, operating instructions, maintenance requirements and safety information for the supplied system.
Training or acceptance record, warranty terms, support contacts and the recommended spare-parts list for the approved configuration.
Commercial terms
Final conditions vary by model, destination and service scope. Your quotation and contract take priority over general website information.
There is no public online checkout. Currency, payment method, deposit or balance milestones and beneficiary details are stated in the official Proforma Invoice or contract.
The quotation states the applicable delivery term, destination, packing basis and which party is responsible for freight, insurance, import clearance, duties and local delivery.
Our general planning reference is 15–30 days for machine production, while final production and shipment timing is confirmed after technical approval and the agreed payment milestone. Transit time depends on the destination and route.
Remote guidance, on-site engineering, travel costs, accommodation, local labor, lifting equipment and commissioning responsibilities are confirmed before ordering.
The contract states the warranty period, covered components, exclusions, spare-parts arrangements and support channel for the supplied configuration.
Do not send funds using bank details received only through an unexpected message. Verify beneficiary details—and any requested change—through your established YOLO contact before payment.
Verify through WhatsApp: +86 137 9289 0284 →Before equipment arrival
Exact dimensions and utility values are model-specific. Do not begin civil or electrical work from general website figures alone.
Confirm the wash bay, equipment room, foundations, drainage, entrance, exit, queuing area and maintenance access.
Prepare the approved power supply, grounding, water supply, storage, compressed air and wastewater arrangement.
Plan container or truck access, unloading space, lifting equipment, secure storage and movement of equipment to the installation area.
Arrange permits, local contractors, construction interfaces, installation personnel and any destination-specific compliance work.
Ordering FAQ
Send your country, site dimensions, expected vehicle volume, available power and water, preferred equipment type and target timeline. We will review the project before preparing a quotation.
Payment currency, method, milestones and beneficiary details are provided in the official Proforma Invoice or sales contract. Website text and informal messages do not replace those written terms.
We can discuss packing, container loading and shipment coordination. The agreed delivery term and quotation define freight, insurance, customs clearance, taxes, destination charges and local delivery responsibilities.
Complete the site work and utilities shown in the approved drawings. This normally includes the wash bay, drainage, electrical supply, water system, equipment room, access and safe unloading arrangements.
Remote guidance and on-site engineering can be discussed by project. The contract must identify the support scope, travel and accommodation costs, local labor, tools, lifting equipment, commissioning and training responsibilities.
Our quality-control process includes sample and component inspections during production and a final inspection before shipment. If your project requires photographs, video, test records or third-party inspection, include that requirement in the contract.
Request the approved configuration and commercial scope, site and utility requirements, packing and shipping documents, installation and operating guidance, commissioning or acceptance checklist, written warranty terms and a recommended spare-parts list. Availability and format are confirmed by project.
Coverage is confirmed for the selected model and configuration in the contract. Request the written warranty terms, exclusions, maintenance schedule and recommended spare-parts list before ordering.
Your next step
Share your dimensions, expected vehicle volume and local utilities. We’ll help you evaluate a suitable configuration.